Schneider Electric Mupgrade Utility Guide d'installation Page 60

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 130
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 59
Using the Configuration Wizard
975-0720-01-01 2–27
This manual is for use by qualified personnel only
Multi-Cluster Configuration Method
To configure a multi-cluster system, first follow steps 1-2 in “Detailed
Configuration Method” on page 2–15 to reset system devices and configure
device numbers, then follow the instructions below.
1. Set the Multi-Cluster AC Association:
a) Set the AC1 Association. This sets the system name for AC1.
b) Set the AC Out Association. This sets the system name for AC Out.
2. Set the Multi-Cluster DC Associations. Set the Solar Array and Battery Bank
number for each applicable device on the system. These associations will
appear throughout the system as SolarArray# and HouseBatBank# as
selected from the drop down menus.
3. Set the Three Phase Unit Assignments by assigning a phase to each
Inverter:
a) In the Three Phase Unit Assignment window, drag and drop the units that
Figure 2-29 Setting the Multi-Cluster AC Association
Figure 2-30 Setting the Multi-Cluster DC Association
Vue de la page 59
1 2 ... 55 56 57 58 59 60 61 62 63 64 65 ... 129 130

Commentaires sur ces manuels

Pas de commentaire